the new construction.

The new construction is coming to close due to outbreak of winters.

The work started during the month of April 2012 with the erection of pillars and first slab was laid just after 1 month.

The first storey got the required fittings done including the art work and a fountain in one corner and cemented plants on the other side.

The second slab took two more months till it was ready and I got my Deluxe bedroom erected along with dry and wet bath room fitted with walk in wardrobe.

The third floor was erected to give it the shape of attic for Marib. The walls for the attic were erected and ground was made for laying of most difficult part of construction- the fitting of roof top.

Due to scorching heat in the month of August the gob of roof got delayed and work got a break.

Somehow the raw material for roof top was arranged and work got started and roof got erected on the new construction in such a fashion that old and new roof top were annexed as a single unit.

The tin was fixed on the roof top during the month of Oct 2012 and had a sigh of relief that I have a roof over my head to fight the chill of winter.

The material for doors windows and under roof top was arranged. The Kashmiri Kail cost ed me Rs. 1350 per foot,the fur(Bud ul) cost ed me Rs 550 per foot the frame material for doors windows cost ed me Rs 720( imported kail).

The next tiresome and time consuming part has started and carpenters have opened their pockets for a long stay till new construction is fitted with doors windows and panelling work put in place.

The doors windows and frames are being prepared during this chilly weather and mason is giving company to the carpenters till all gaps are filled to keep rodents the rats away from the living space.

Today ie. 8/12/2012 the masonry work is reaching to an end and now they will shift towards concreatization of roads and side walling of path way.

The carpenters will start making arrangements for the paneling of living room the wardrobes the paneled doors and dressing tables and it may carry up to March 2013 if God willing.

Let me hope that finishing of the new construction is completed before the summers so that I can breath easy live easy and stay cool.

Wish me luck so that I am able to complete all the necessary steps to make new construction worth living.

Winter is calling let us cover up our bodies to avoid chill.